Kowloon Southern Link

Termini
  • Nam Cheong
  • Hung Hom
Stations4ServiceTypeHeavy railSystemMTR East Rail line, Tuen Ma lineHistoryOpenedAugust 16, 2009; 14 years ago (2009-08-16)TechnicalLine length3.8 km (2.4 mi)Track gauge1,435 mm (4 ft 8+12 in) standard gaugeElectrification25 kV 50 Hz AC (Overhead line)
Route map

Legend
Colour legend
Kowloon Southern Link


East Rail line
to Lo Wu or Lok Ma Chau
Up arrow
Hung Hom     
East Tsim Sha Tsui
Tsuen Wan line
Left arrow Tsuen Wan – Central Right arrow
Tsim Sha Tsui      (osi)
Austin
Nam Cheong     
This diagram:
  • view
  • talk
  • edit

The Kowloon Southern link is a section of the MTR East Rail and Tuen Ma line linking Nam Cheong station and Hung Hom station. The rail link is fully underground, lies along the south-west coastline of Kowloon Peninsula, east of rail tracks of the Tung Chung line and Airport Express. Kowloon Southern Link has one underground intermediate station called Austin station (formerly West Kowloon station). It is located adjacent to the Canton Road Government Offices,[1] close to Kowloon station of Tung Chung line and Airport Express. However, the structures do not provide a direct transfer between the two stations.

History

Map of the Kowloon Southern Link before 2021, as part of the West Rail line (in purple)
Kowloon Southern Link construction site in June 2009

The project was originally proposed and carried out by Kowloon-Canton Railway Corporation (KCRC) to link the KCR West Rail that terminated at Nam Cheong station to the KCR East Rail at Hung Hom station. The tracks between Hung Hom and East Tsim Sha Tsui station had opened in 2004 as the Tsim Sha Tsui Extension, to alleviate surface traffic jams and congestion at Kowloon Tong station caused by passengers transferring between the KCR East Rail and the MTR by acting as a second interchange between the two system.

Construction of the Kowloon Southern Link began in late 2005 by the KCRC, after the company's network was taken over by MTR Corporation Limited (MTRC) on 2 December 2007, the project was continued by MTRC. The link went into service on 16 August 2009.[2]

Upon the completion of the rail link, the West Rail line assumed the tracks from the East Tsim Sha Tsui to Hung Hom portion of the East Rail line. At the same time both the East Rail and West Rail lines were altered to terminate in the south at Hung Hom station, with the platform and tracks at Hung Hom being rearranged to provide cross-platform interchange between the two lines (it forms two sets of island platforms).

Upon the opening of the extension, a new Tuen Mun-Hung Hom Monthly Pass was introduced for unlimited rides of the whole West Rail line (including the new extension).[3]

On 27 June 2021, the West Rail line officially merged with the Ma On Shan line (which was already extended into the Tuen Ma line Phase 1 at the time) in East Kowloon to form the new Tuen Ma line, as part of the Shatin to Central link project. Hence, the Kowloon Southern Link portion of the West Rail line was absorbed by the new line and is now the central and southernmost part of the Tuen Ma line.

Proposed Canton station

Canton station (Chinese: 廣東站) was a planned railway station on the Kowloon Southern Link of West Rail line between East Tsim Sha Tsui station and Austin station,[4] beneath the shopping mall, Harbour City in Tsim Sha Tsui, by replacing the existing underground car park. But it was never to be built because of the failed negotiations between the KCRC and The Wharf (Holdings) Limited, the owner of the Harbour City.

Originally KCRC requested The Wharf to fully or partially fund the construction of the station for HKD 1.8 billion. The Wharf disagreed, questioning if it was reasonable for a private enterprise to undertake the construction cost of public facilities. The station was eventually omitted from the project, officially announced on 6 December 2004.[5][6]

See also

References

  • ETWB (2005). Kowloon Southern Link. LC Paper No. CB(1)609/04-05(04)..
  1. ^ Press release "Kowloon Southern Link to open in third quarter 2009", 10 July 2009
  2. ^ "Kowloon Southern Link Opens on 16 August" (PDF) (Press release). Hong Kong: MTR Corporation. 30 July 2009. Retrieved 18 February 2015.
  3. ^ "MTR > Monthly Pass Extra".
  4. ^ https://www.legco.gov.hk/yr05-06/english/panels/tp/tp_rdp/papers/tp_rdp0217cb1-792-4e.pdf [bare URL PDF]
  5. ^ Canton Road Station, Kowloon Southern Link, Legislative Council of Hong Kong
  6. ^ "Canton Road Station (CAR)". Archived from the original on 16 July 2011. Retrieved 11 December 2010.

External links

  • Media related to Kowloon Southern Link at Wikimedia Commons
  • KDB200 Construction Animation
  • MTR – Projects – Kowloon Southern Link
  • Environmental Impact Assessment Report of Kowloon Southern Link (approved by EPD)
  • Information on Kowloon Southern Link from Subcommittee on Matters Relating to Railways, Panel on Transport, Legislative Council of Hong Kong
  • v
  • t
  • e
Mass Transit Railway (MTR) public transport system of Hong Kong
Rail
service
Lines
Rapid transit
  • Disneyland Resort line
  • East Rail line
  • Island line
  • Kwun Tong line
  • South Island line
  • Tseung Kwan O line
  • Tsuen Wan line
  • Tuen Ma line
  • Tung Chung line
Airport rail link
  • Airport Express
Light rail
  • Light Rail
Cross-border Hong KongChina
Under construction
or planning
Rolling
stock
In operation
Retired
  •      Metro Cammell EMU (AC): MLR
Non-rail
service
* Operated solely by trains from mainland China
  • v
  • t
  • e
Stations
Planned
Rolling stock
History
Stations that are proposed, under planning or under construction are shown in italics.

22°18′32″N 114°09′51″E / 22.3090°N 114.1643°E / 22.3090; 114.1643