Taman Naga Emas MRT station
Metro station in Selangor, Malaysia
Preceding station | ![]() | Following station | ||
---|---|---|---|---|
Kuchai towards Kwasa Damansara | Putrajaya Line | Sungai Besi towards Putrajaya Sentral |
The Taman Naga Emas MRT station is a mass rapid transit (MRT) station in Salak Selatan district in southern Kuala Lumpur, Malaysia. It is one of the stations on the MRT Putrajaya Line.[1]
The station is opened to public on 16 March 2023.
Location
The station is near the PLUS toll road and the Besraya toll road. It is also approximately 1.5 km west of KB04 SP15 KT2 Bandar Tasik Selatan station. There is one shuttle bus connecting the station to Sri Petaling new township.
References
- ^ "MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit". Archived from the original on 27 June 2017. Retrieved 6 December 2017.
External links
- Klang Valley Mass Rapid Transit website
- MRT Hawk-Eye View
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
Stations and services in italics are planned or under construction
![]() | This Malaysian rapid transit article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e